HOW LONG WILL IT TAKE TO CLEAR THE ROADS AFTER A SNOWSTORM?

This varies. If there is a lot of snow, or if the snow is heavy and moist, or if there is a strong wind, it can take longer to move the snow and fight drifts – and can take several days to complete road clearing.

Depending on road conditions, it can take up to 72 hours for a grader to complete its entire beat after it stops snowing as per Gravel Road Maintenance Requirements Policy.  However, strong winds can close a road before the 72 hours have lapsed. 

Timing can be severely affected by the amount of snow, temperature, continuing bad weather such as wind causing drifts or by poor visibility.


1.
2.
3.
4.
5.