Alberta Transportation will be doing bridge maintenance on Highway 13 over the railway near Bittern Lake starting August 2 until August 15 (day only).
Bridge Maintenance and repairs will reduce traffic to one lane alternating traffic. Speed limit will be reduced to 50 km/hr through the construction zones. Flag persons may be present as required and motorist should be prepared to stop. Obey all construction signs and speed limits while driving through this area.